Irondequoit · issues
Civic issues
Topics getting the most attention in Town of Irondequoit public meetings, ranked by how frequently they come up.
Small-Cell Wireless and Rental Property Regulations
The town enacted key zoning changes to promote walkable mixed-use districts, eliminate parking minimums, and require planning board oversight for small-cell wireless towers.
Commercial Infill Development at 633 Titus Avenue
BME Associates proposed a 2,386-square-foot Chipotle restaurant with a mobile-order pickup lane on Lot 2 of 525 Titus Avenue. The board reviewed site access, parking easements, and pedestrian connectivity.
Commercial Drive-Through Coffee Kiosk on East Ridge Road
Brew Team NY presented revised site plans for a Seven Brew coffee kiosk featuring traffic calming islands and pedestrian connections. Board members raised ongoing concerns about traffic flow and congestion within the commercial plaza.
Special Use Permit for Backyard Chickens at 176 Parkview Terrace
Residents can keep small backyard flocks if they adhere to strict sanitation, coop setback, and fencing standards. The board reviewed an application on Biltmore Drive that sparked some neighbor debate over property cleanliness before ultimately approving it.
New Single-Family Home Variances at 30 Anchor Terrace
Builder Adam Tellier requested lot coverage and garage/entrance setback variances for a new home intended for a relocating family.
Chipotle Development Setback Variances at Irondequoit Plaza
Developers are bringing a new fast-casual Chipotle restaurant to Irondequoit Plaza at 525 Titus Avenue, requiring setback variances. The project utilizes reciprocal parking easements and includes a mobile order pickup window.
New 22-Unit Apartment Building Proposal at 1422 Portland Avenue
Morgan Northside Manor wants to combine seven lots to build a new 22-unit apartment building, but the project needs zoning variances for parking and lot area before it can move forward.
Pioneer House Roof Replacement
The historical society is discussing repair estimates for the Pioneer House, specifically addressing roof repairs and structural integrity. The commission emphasized that any work beyond repair-in-kind requires their formal review.
CLG Grant Application for Historic Districts
The commission is gearing up to apply for Certified Local Government grant funding by September 15 to study potential historic districts along St. Paul Boulevard and Laurelton.
Bishop Kearney High School Athletic Facility Expansion
Bishop Kearney High School won approval to build a 66,000-square-foot wellness and hockey center to support its elite athletic programs and student body.
Residential Setbacks and Drainage Concerns on Rock Beach Road
A developer sought to renew setbacks for a home build on Rock Beach Road, raising neighborhood concerns about drainage and water pooling during heavy rains.
Community Development Block Grant (CDBG) Subrecipient Agreements
The town is holding a public hearing next week on its CDBG action plan, continuing funding for home repairs, senior programs, and sidewalk upgrades.
Hudson Avenue Multi-Family Residential Development
A developer wants to build two apartment buildings with 93 units on Hudson Avenue, but neighbors and board members are worried about neighborhood safety, security, and whether the project meets town zoning density rules.
Hudson Avenue Multi-Family Apartment Development
Developers of a 93-unit apartment complex on Hudson Avenue needed an extra density variance because town code limits properties to 45 units based on lot size. The board approved the variance after confirming the building dimensions haven't changed since December.
Harwick Road Residential Porch Setback
A homeowner requested relief from front setback requirements to replace an aging concrete patio with a small composite porch and steps.
Commercial Redevelopment at 1765 E. Ridge Road
Key Bank is proposing a new 3,500-square-foot branch with a drive-thru and 24-hour ATM on an outparcel near the existing Aldi development. Board members reviewed lighting plans, dumpster enclosures, and landscaping requirements.
Future Development of Former St. Thomas the Apostle School
Residents raised concerns about long-term development plans and potential future commercial uses at the former St. Thomas the Apostle School property on Colbrook Drive.
Key Bank Commercial Development on East Ridge Road
Key Bank is proposing a new 3,500-square-foot branch with drive-thru services at 1765 E. Ridge Road. The project requires preliminary and final site plan approval from the planning board.
Mall Redevelopment
The long-abandoned Irondequoit Mall is finally getting a huge makeover, completely transforming a major local shopping area. This project breathes new life into a massive empty space that has sat dormant for years.
Economic Development
That empty Irondequoit Mall site is finally getting a major upgrade! Rochester Regional Health is moving a brand-new nursing school into the long-vacant property, bringing some serious life back to the area.